Tubeline Installation Advice

tubular linear ceiling

Notes

Emac hangers should be installed a maximum of 300mm from the end of a run of TCA0219 carrier and 300mm from the joint between these carriers.

The TCA0219 carrier should be installed a maximum 600mm from the end of any tube. Where these tubes meet and are spliced together, a TCA0219 carrier should be installed within 600mm.

It is considered good practice to stagger joints in supporting structures.

For further advice please contact SAS technical department.
 

 

System Tubeline Isometric Drawing Thumb

 

 

award sponsor

bco-logo2013 (170 x 170)
Pleased to be sponsoring
'Fit out of Workplace' award

world-class interiors

corporate (170 x 104)
Watch our new corporate video or download a copy of the brochure.

find us on

Tweet (30 x 30) linkedin (30 x 30) Fb (30 x 30) youtube (30 x 30) plus-badge

career opportunites

Current career opportunities within SAS

register for updates

Please enter your email address below to register for updates